Skip to content
Lattice.
Features
Pricing
All Industries

Manufacturing

Quality Inspections, Production Tracking, Defect Management

THE PROMPT

“I run a manufacturing plant with 3 production lines. I need station-by-station quality checks, defect logging with photos, production batch tracking, SPC data collection, and automated non-conformance reports.”

Lattice builds the complete system from this single prompt: 5 entities, 62+ fields, 6 automations.

Lattice. AI
Click Run to watch the system build

Data Schema

(5 entities, 62 fields)
FieldTypeRequired
Inspection IDAuto-ID (QI-####)
BatchRelation → Production Batches
StationSelect[Incoming, In-Process S1, In-Process S2, In-Process S3, Final, Outgoing]
InspectorRelation → Operators
Sample SizeNumber
Measurement 1Number—
Measurement 2Number—
Measurement 3Number—
Within SpecSelect[Yes, No, Marginal]
Visual CheckSelect[Pass, Fail]
Functional TestSelect[Pass, Fail, N/A]
ResultSelect[Accept, Reject, Hold for Review]
PhotosImages (multi)—
NotesLong Text—
DateDateTime (auto)

Automations

(6 rules)

When Inspection result → "Reject"

Place batch on QC Hold
Create defect record
Alert line supervisor

When Defect severity → "Critical"

Stop production line
Generate NCR (Non-Conformance Report)
Alert quality manager and plant manager

When Batch status → "Released"

Calculate yield rate
Update product defect rate
Generate batch certificate

When measurement outside tolerance

Flag inspection as out-of-spec
Update SPC chart data point
Alert if 3+ consecutive out-of-spec

When Batch QR code scanned

Load batch details and history
Show all inspections for batch
Pre-fill inspection form

End of shift

Generate production summary
Calculate OEE metrics
Email shift report to management

Available Views

Sample Workflow: In-Process Quality Check

10:00 AM

QC inspector scans batch QR at Station 2

→ Batch BAT-0847 loaded: Widget Assembly, Line 2, 500 units

10:02 AM

Inspector pulls 5-piece sample, measures dimensions

→ Measurements: 25.02, 25.01, 25.03, 24.98, 25.05 mm (spec: 25.00 ±0.10)

10:05 AM

Visual and functional checks completed

→ All pass — inspection result: Accept

10:06 AM

Inspection submitted

→ SPC chart updated, data point within control limits

2:00 PM

Next inspection: measurement reads 25.12 (out of spec)

→ Auto-alert: out-of-spec measurement, defect record created

2:05 PM

Line lead investigates, finds tool wear

→ Tool replaced, batch placed on hold, 20 units flagged for re-inspection

Start with this template

Complete manufacturing QMS with station inspections, SPC tracking, and automated non-conformance reporting.

Lattice.

The AI-first business platform. Describe what you need, Lattice builds it. No code required.

Product

  • Features
  • Pricing
  • Industries
  • Templates
  • Mobile Apps

Company

  • About
  • Blog
  • Careers
  • Contact
  • Press

Resources

  • Documentation
  • Help Center
  • API Reference
  • Status
  • Changelog

Legal

  • Privacy Policy
  • Terms of Service
  • Cookie Policy
  • Security

© 2026 Lattice. All rights reserved.

Made with ♥ for field teams everywhere